This project was a reroof of a ballasted EPDM roof. Ballast Rock was removed and a recovery board was installed over the old EPDM. A new 50 mil Duro-Last Membrane roof as installed with the induction welded technique.
This project was a reroof of a ballasted EPDM roof. Ballast Rock was removed and a recovery board was installed over the old EPDM. A new 50 mil Duro-Last Membrane roof as installed with the induction welded technique.