This was a new construction project on a large Beverage Distribution location in Monticello.   This project included a double layer of Duro-Guard ISO insulation and Duro-Last Carpet Rolls were used due to the cold temperatures.   Exceptional Metals 2-piece compression metal finished off the outside perimeter edge.

Leave a Reply

Your email address will not be published. Required fields are marked *

Post comment